XINYA supplies excavator parts including hydraulic pumps, travel motors, swing devices, control valves, engine parts and undercarriage components. Send us your machine model, OEM part number or product photo for fast matching and quotation.

3aeec4f8-d38e-413a-9f7f-2a77eeb4f66d
20260612163804h0_69b003c52c91a259174eaec49cb8c133 (1)
20260612163727h0_1e827f675c390dec8941368ac239be82 (1)
20260612163524h0_745752a143f4fb099d09dadba10c5248 (1)
工厂
优势1
物流
展会图最终
证书和品牌
3aeec4f8-d38e-413a-9f7f-2a77eeb4f66d
20260612163804h0_69b003c52c91a259174eaec49cb8c133 (1)
20260612163727h0_1e827f675c390dec8941368ac239be82 (1)
20260612163524h0_745752a143f4fb099d09dadba10c5248 (1)
工厂
优势1
物流
展会图最终
证书和品牌

21N-60-34100 Travel Motor Final Drive for Komatsu PC1250

Place of Origin China/Japan
Brand Name LIRACE/Komatsu
Model Number PC1250-7 PC1250-8
Minimum Order Quantity 1 PCS
Price Negotiable price
Packaging Details Wooden case or as required
Delivery Time 5-8 Weekdays
Payment Terms Western Union,T/T
Supply Ability 300pcs /Month
20260612163357h0_a0cbc37919ce5163b49a7ac4fece6aee_副本 (1)
Basic Parameters & Introduction
This mining grade heavy-duty travel assembly (integrating high-voltage travel motor and main reducer) has core original part numbers including: 21N-60-34100 (travel motor/motor assembly), 21N-27-00130, 21N-27-00140, and 21N-27-00190. This assembly is specially designed for Komatsu's large mining excavators, perfectly matching the main 120 ton models such as PC1250-7 and PC1250-8. The product is based on first principles for ultra heavy load transmission and high-pressure fluid dynamics optimization, ensuring absolute certainty of walking drive under extreme impact conditions. The physical dimensions of the product packaging are approximately 1180mm × 1120mm × 1150mm, with an overall net weight of approximately 1450kg. The original factory standard position is precisely aligned.
20260612163727h0_1e827f675c390dec8941368ac239be82 (1)
Maintenance Tips
"Daily inspection (every 10 hours): Before starting each shift, it is mandatory to inspect the drive wheels, large-diameter floating oil seals, and motor pipe openings to identify any trace leakage hazards.

Oil change during running in period (250 hours of operation): After the new assembly has been running for 250 hours for the first time, it must be forcibly drained and the gearbox gear oil must be replaced to thoroughly remove the hard metal particles generated during the initial running in period.

Regular mandatory replacement (every 1000 hours): Heavy duty mining grade gear oil (such as SAE 85W-140) must be thoroughly replaced every 1000 hours of operation (or up to 1 year). In harsh mining or frequent crushing conditions, the cycle needs to be forcibly shortened by 50%."
20260612163804h0_69b003c52c91a259174eaec49cb8c133 (1)
Installation Tips
"Extreme cleaning and hydraulic fastening: Before lifting and docking, the installation surface of the track frame must be absolutely flat and free of any foreign objects. All high-strength fastening bolts must be coated with special anti seize compound and tightened in multiple stages and symmetrically with hydraulic or high torque wrenches strictly in accordance with the original factory's specified torque.

Motor forced oil filling (core avoidance pit): Do not connect the wrong drain pipe (Case Drain) when connecting high-pressure hydraulic pipelines. Before starting the engine, clean hydraulic oil must be filled from the oil injection port on the top of the travel motor housing. Dry grinding is strictly prohibited during start-up, otherwise the internal plunger will undergo irreversible physical erosion within 3 seconds of ignition.

Transition of aerial exhaust test: Use a working device to suspend the track on one side, control the walking mechanism to run slowly and alternately for 15-20 minutes, exhaust the air inside the circuit, closely monitor the gear meshing sound, and confirm the thermodynamic stability before gradually putting it into operation."
Brand China/Sweden Brand Name LIRACE/Komatsu
Model PC1250-7 PC1250-8 Product Name Final Drive
Part Number 21n-60-34100 21n-27-00130 21n-27-00140 21N-27-00190 ApplicableBrand Komatsu
Warranty Period 6-12 months Condition NEW
Standard or Non-standard Standard Type Guarantee We will inspect the products and send detailed pictures to the buyer for confirmation.
Applicable Industries Mechanical Repair Shops, Retail, Construction, Energy, Mining Shipping Method Sea freight, Air freight, DHL/FEDEX/TNT/EMS

Related Products

read More

Related News

Read More

7/ November

Multi-grade Spare Parts Solutions: Original, Aftermarket & Remanufactured Parts from Heriu(Xinya) Machinery

Multi-grade Spare Parts Solutions: Original, Aftermarket & Remanufactured Parts from Heriu(Xinya) Machinery
Learn More
图片4 (1)

7/ November

Relief Valves Across 17 Excavator Brands: XINYA Stocks the Numbers Your Shop Actually Needs

We now stock main relief valves, swing relief valves, travel relief valves, unloading valves, signal valves and pump control valves — across 17 equipment brands, with both genuine and domestic replacement options on the shelf.
Learn More
图片2

7/ November

Undercarriage Inspection Records: What to Photograph and Measure Before a Parts Inquiry

Prepare undercarriage inspection photos and measurement records for a parts inquiry. Record each side, component position, observation and missing information.
Learn More
Track shoe reference view

30/ October

Same Excavator Model, Different Hydraulic Parts? What Buyers Should Verify

Compare machine, installed-part and offered-part records before buying hydraulic components. Review version, interface and control differences with XINYA.
Learn More
Excavator hydraulic pump with regulator assembly
What We Do

Services we Offer

service1

What if there are quality problems with the purchased products?

Please rest assured completely. We implement strict quality control throughout the whole production process. From raw material incoming inspection to finished product delivery, all items undergo multiple rounds of rigorous technical inspection and performance testing, to fully ensure every delivered product meets 100% qualified standards. All unqualified products detected during inspection will be disposed of by centralized destruction, to firmly prevent defective goods from entering the market. Meanwhile, we provide an extended warranty period of 6 to 12 months for all products. Within the warranty period, if any non-artificial quality failure occurs, please contact us promptly. Our professional technical team will respond at the earliest time and offer targeted solutions based on actual conditions. In addition, we deliver all-round technical support to safeguard your after-sales operation. Always taking customer satisfaction as the core principle, we are committed to establishing long-term and stable cooperative partnerships with global clients.
service2

What happens if the delivered item is unsuitable for my needs?

Please rest assured. To ensure that the products you receive fully meet your needs, we will conduct multiple rounds of demand confirmation with you before shipment, fundamentally avoiding the problem of wrong or missing delivery. To further ensure accuracy, we will first conduct precise query and verification through the product part number you provide to ensure that the product model and specifications are completely matched. If you do not have an accurate part number temporarily, we will arrange professional technicians to check and confirm one by one according to the clear product pictures and corresponding construction machinery models you provide, and communicate and synchronize with you throughout the process until confirmed correct before arranging shipment, to fully ensure that you receive the products you need and avoid unnecessary troubles.
service3

What professional shipping and delivery standards can we provide you?

Within our international trade operations, we prioritize a high-efficiency supply chain and a transparent logistics framework. To ensure the accuracy of every shipment, a standardized PDI (Pre-Delivery Inspection) system is strictly enforced. Before the final sealing of containers, our QC specialists conduct a thorough re-examination. We provide clients with high-resolution photos of the actual items, packaging details, and the Packing List for Visual Confirmation, ensuring 100% compliance with order specifications and delivery transparency. We support versatile Incoterms, including EXW and FOB. To meet diverse delivery timelines and cost constraints, we offer a multi-modal logistics matrix ranging from Ocean Freight and Air Freight to global couriers (DHL/FEDEX/TNT/EMS). We guarantee full professional documentation support for every shipment to ensure a safe, timely, and compliant arrival at the port of destination.
Send Your Message

Get in Touch

We are a global one-stop supplier of excavator spare parts. We maintain full control over the entire process from R&D and manufacturing to sales, delivering top-quality excavator components to you.

    Your Name *

    Email *

    Phone/WhatsApp *

    Company website

    Message*

    Products
    Contacts
    WhatsApp
    Email