XINYA supplies excavator parts including hydraulic pumps, travel motors, swing devices, control valves, engine parts and undercarriage components. Send us your machine model, OEM part number or product photo for fast matching and quotation.

1 (3)
1 (6)
1 (5)
1 (4)
1 (2)
1 (1)
工厂
优势1
物流
展会图最终
证书和品牌
1 (3)
1 (6)
1 (5)
1 (4)
1 (2)
1 (1)
工厂
优势1
物流
展会图最终
证书和品牌

Heavy Duty Swing Motor Assembly 547-9727 591-0774 For Cat E395 395F Excavator | Complete Rotary Gearbox Drive

Place of Origin China/US
Brand Name LIRACE/Caterpillar
Model Number 547-9727 591-0774

Cat E395 395F

Minimum Order Quantity 1 PCS
Price Negotiable price
Packaging Details Wooden case or as required
Delivery Time 5-8 Weekdays
Payment Terms Western Union,T/T
Supply Ability 300pcs /Month
1 (6)
Basic Parameters & Introduction
This mining grade heavy-duty high-precision rotary motor gearbox assembly (Complete Swing Assembly) has Caterpillar original core part number 547-9727 and is perfectly compatible with the new generation replacement code 591-0774. This top-level rotary drive device is specially designed for Caterpillar's high standard heavy-duty mining excavators, accurately matching 95 ton core flagship giant excavators such as CAT E395, 395, 395F, etc. The product is based on first principles for integrated optimization of ultra-high pressure fluid dynamics motor and ultra heavy load multi-stage planetary gear system, seamlessly carrying the ultimate alternating shear stress caused by the large inertia starting and braking of nearly a hundred ton vehicle body, ensuring absolute certainty of rotary propulsion torque. The physical dimensions of the product packaging are approximately 850mm × 850mm × 1210mm, with an overall net weight of approximately 720kg. The original factory holes are precisely aligned with the gear shaft.
1 (5)
Maintenance Tips
"Daily inspection (every 10 hours): Before starting work every day, it is mandatory to check the oil level of the gearbox gears through an oil dipstick, with a focus on inspecting the motor control valve block and the bottom large-diameter shaft seal to prevent trace leakage caused by hard slag wear.

First break in oil change (100 hours of operation): After the new assembly is put into operation for the first time or undergoes major repairs and runs for 100 hours, the old oil in the internal cavity must be forcibly drained and all gearbox gear oil must be replaced to thoroughly remove the hard metal debris generated during the initial break in period.

Regular hard replacement (every 1000 hours): The heavy-duty high-grade gear oil (such as SAE 80W-90 or 85W-140) in the gearbox must be thoroughly replaced every 1000 hours of operation (or up to 1 year). Under harsh continuous mining conditions, the cycle is forcibly halved."
1 (1)
Installation Tips
"Extreme cleaning and torque tightening: Before using heavy-duty lifting equipment for docking, the installation surface of the turntable frame and the large gear ring of the slewing support must be absolutely flat and free of any foreign objects or rust. All ultra-high strength fastening bolts must be tightened using a large torque wrench, strictly following the factory's specified torque for symmetrical and multi-stage cross tightening to prevent local abnormal shear stress from causing deformation of the shell.

Forced bidirectional oil injection between motor and casing (core avoidance pit): Do not connect the wrong drain pipe (Case Drain) when connecting hydraulic pipelines. Before starting the engine, it is necessary to fill the top of the rotary motor housing with clean hydraulic oil through the air release/oil injection port; At the same time, attention must be paid to loading the gear oil inside the gearbox to the oil dipstick standard line. It is strictly prohibited to start dry grinding, otherwise the rotating components will undergo irreversible physical erosion within 3 seconds of ignition.

No load micro exhaust transition: After the first ignition, control the upper body to rotate left and right at a small angle and slow speed alternately for 15-20 minutes in a no-load state, thoroughly exhaust the air inside the circuit, and closely monitor the gear meshing sound. Only after confirming that the thermodynamic state of the entire system is stable can normal mining operation loads be gradually applied."
Brand China/US Brand Name LIRACE/Caterpillar
Model Cat E395 395F Product Name Swing Drive Assembly
Part Number 547-9727 591-0774 ApplicableBrand Caterpillar
Warranty Period 6-12 months Condition NEW
Standard or Non-standard Standard Type Guarantee We will inspect the products and send detailed pictures to the buyer for confirmation.
Applicable Industries Mechanical Repair Shops, Retail, Construction, Energy, Mining Shipping Method Sea freight, Air freight, DHL/FEDEX/TNT/EMS

Related Products

read More

Related News

Read More

7/ November

Multi-grade Spare Parts Solutions: Original, Aftermarket & Remanufactured Parts from Heriu(Xinya) Machinery

Multi-grade Spare Parts Solutions: Original, Aftermarket & Remanufactured Parts from Heriu(Xinya) Machinery
Learn More
图片4 (1)

7/ November

Relief Valves Across 17 Excavator Brands: XINYA Stocks the Numbers Your Shop Actually Needs

We now stock main relief valves, swing relief valves, travel relief valves, unloading valves, signal valves and pump control valves — across 17 equipment brands, with both genuine and domestic replacement options on the shelf.
Learn More
图片2

7/ November

Undercarriage Inspection Records: What to Photograph and Measure Before a Parts Inquiry

Prepare undercarriage inspection photos and measurement records for a parts inquiry. Record each side, component position, observation and missing information.
Learn More
Track shoe reference view

30/ October

Same Excavator Model, Different Hydraulic Parts? What Buyers Should Verify

Compare machine, installed-part and offered-part records before buying hydraulic components. Review version, interface and control differences with XINYA.
Learn More
Excavator hydraulic pump with regulator assembly
What We Do

Services we Offer

service1

What if there are quality problems with the purchased products?

Please rest assured completely. We implement strict quality control throughout the whole production process. From raw material incoming inspection to finished product delivery, all items undergo multiple rounds of rigorous technical inspection and performance testing, to fully ensure every delivered product meets 100% qualified standards. All unqualified products detected during inspection will be disposed of by centralized destruction, to firmly prevent defective goods from entering the market. Meanwhile, we provide an extended warranty period of 6 to 12 months for all products. Within the warranty period, if any non-artificial quality failure occurs, please contact us promptly. Our professional technical team will respond at the earliest time and offer targeted solutions based on actual conditions. In addition, we deliver all-round technical support to safeguard your after-sales operation. Always taking customer satisfaction as the core principle, we are committed to establishing long-term and stable cooperative partnerships with global clients.
service2

What happens if the delivered item is unsuitable for my needs?

Please rest assured. To ensure that the products you receive fully meet your needs, we will conduct multiple rounds of demand confirmation with you before shipment, fundamentally avoiding the problem of wrong or missing delivery. To further ensure accuracy, we will first conduct precise query and verification through the product part number you provide to ensure that the product model and specifications are completely matched. If you do not have an accurate part number temporarily, we will arrange professional technicians to check and confirm one by one according to the clear product pictures and corresponding construction machinery models you provide, and communicate and synchronize with you throughout the process until confirmed correct before arranging shipment, to fully ensure that you receive the products you need and avoid unnecessary troubles.
service3

What professional shipping and delivery standards can we provide you?

Within our international trade operations, we prioritize a high-efficiency supply chain and a transparent logistics framework. To ensure the accuracy of every shipment, a standardized PDI (Pre-Delivery Inspection) system is strictly enforced. Before the final sealing of containers, our QC specialists conduct a thorough re-examination. We provide clients with high-resolution photos of the actual items, packaging details, and the Packing List for Visual Confirmation, ensuring 100% compliance with order specifications and delivery transparency. We support versatile Incoterms, including EXW and FOB. To meet diverse delivery timelines and cost constraints, we offer a multi-modal logistics matrix ranging from Ocean Freight and Air Freight to global couriers (DHL/FEDEX/TNT/EMS). We guarantee full professional documentation support for every shipment to ensure a safe, timely, and compliant arrival at the port of destination.
Send Your Message

Get in Touch

We are a global one-stop supplier of excavator spare parts. We maintain full control over the entire process from R&D and manufacturing to sales, delivering top-quality excavator components to you.

    Your Name *

    Email *

    Phone/WhatsApp *

    Company website

    Message*

    Products
    Contacts
    WhatsApp
    Email