XINYA supplies excavator parts including hydraulic pumps, travel motors, swing devices, control valves, engine parts and undercarriage components. Send us your machine model, OEM part number or product photo for fast matching and quotation.

1 (1)
1 (1)
1 (3)
1 (2)
工厂
优势1
物流
展会图最终
证书和品牌
1 (1)
1 (1)
1 (3)
1 (2)
工厂
优势1
物流
展会图最终
证书和品牌

KOMATSU PC500 PC500-10 PC500LC EXCAVATORS FINAL DRIVE ASSEMBLY 2A8-27-00110 FINAL DRIVE MOTOR HIGH QUALITY TRAVEL MOTOR CONSTRUCTION MACHINERY

Place of Origin China/Japan
Brand Name LIRACE/Komatsu
Model Number 2A8-27-00110

PC500 PC500-10 PC500LC

Minimum Order Quantity 1 PCS
Price Negotiable price
Packaging Details Wooden case or as required
Delivery Time 5-8 Weekdays
Payment Terms Western Union,T/T
Supply Ability 300pcs /Month
1 (1)
Basic Parameters & Introduction
This mining heavy-duty high-precision travel device assembly (integrating high-voltage travel motor and planetary reduction gearbox), with original core part number 2A8-27-00110 from Komatsu. This top-level Final Drive Assembly is specially customized for Komatsu's large hydraulic excavators, perfectly matching core mining star models such as PC500, PC500-10, and PC500LC in the 50 ton industry. The product is based on first principles for integrated optimization of fluid dynamics high-pressure plunger and heavy-duty multi-stage planetary gear system, seamlessly carrying the complex alternating loads caused by high-frequency steering under harsh mining conditions, ensuring absolute certainty of propulsion torque. The physical dimensions of the product packaging are approximately 810mm × 680mm × 710mm, with an overall net weight of approximately 465kg. The original factory standard hole positions are precisely aligned.
1 (2)
Maintenance Tips
"Daily inspection (every 10 hours): Before starting work every day, it is mandatory to inspect the large-diameter floating oil seal, drive wheel interface, and motor high-pressure pipe opening to check for abnormal noise and prevent trace leakage caused by hard slag wear.

Oil change during running in period (150 hours of operation): After the new assembly has been running for 150 hours for the first time, the old oil in the inner cavity must be forcibly drained and the gearbox gear oil must be replaced to thoroughly remove the hard metal debris generated during the initial running in period.

Regular hard replacement (every 1000 hours): The heavy-duty high-grade gear oil (such as SAE 80W-90 or 85W-140) in the gearbox must be thoroughly replaced every 1000 hours of operation (or up to 1 year). Under harsh continuous mining operating conditions, the cycle is forcibly halved."
1 (3)
Installation Tips
"Extreme cleaning and torque tightening: Before using heavy-duty lifting equipment for docking, the installation surface of the trolley frame base and the drive wheel flange must be absolutely flat and free of any foreign objects. All high-strength fastening bolts must be tightened using torque wrenches, strictly following the factory's specified torque for symmetrical and phased cross tightening, to prevent slight deformation of the shell due to local stress concentration.

Motor forced oil filling (core avoidance pit): When connecting hydraulic pipelines, they must be absolutely aligned and do not connect the wrong drain pipe (Case Drain). Before starting the engine, it is necessary to fill the top of the walking motor housing with clean hydraulic oil through the air release/oil injection port. Dry grinding is strictly prohibited for starting, otherwise the internal rotating components will undergo irreversible physical erosion within 3 seconds of ignition.

Idle micro exhaust transition: Use a working device to suspend the entire machine's single-sided track support, control the walking mechanism to run slowly and alternately in front and back micro motion for 10-15 minutes, thoroughly exhaust the air inside the circuit, and closely monitor the gear meshing sound. Only after confirming the thermodynamic state is stable can the working load be applied on the ground."
Brand China/Japan Brand Name LIRACE/Komatsu
Model PC500 PC500-10 PC500LC Product Name Final Drive
Part Number 2A8-27-00110 ApplicableBrand Komatsu
Warranty Period 6-12 months Condition NEW
Standard or Non-standard Standard Type Guarantee We will inspect the products and send detailed pictures to the buyer for confirmation.
Applicable Industries Mechanical Repair Shops, Retail, Construction, Energy, Mining Shipping Method Sea freight, Air freight, DHL/FEDEX/TNT/EMS

Related Products

read More

Related News

Read More

7/ November

Multi-grade Spare Parts Solutions: Original, Aftermarket & Remanufactured Parts from Heriu(Xinya) Machinery

Multi-grade Spare Parts Solutions: Original, Aftermarket & Remanufactured Parts from Heriu(Xinya) Machinery
Learn More
图片4 (1)

7/ November

Relief Valves Across 17 Excavator Brands: XINYA Stocks the Numbers Your Shop Actually Needs

We now stock main relief valves, swing relief valves, travel relief valves, unloading valves, signal valves and pump control valves — across 17 equipment brands, with both genuine and domestic replacement options on the shelf.
Learn More
图片2

7/ November

Undercarriage Inspection Records: What to Photograph and Measure Before a Parts Inquiry

Prepare undercarriage inspection photos and measurement records for a parts inquiry. Record each side, component position, observation and missing information.
Learn More
Track shoe reference view

30/ October

Same Excavator Model, Different Hydraulic Parts? What Buyers Should Verify

Compare machine, installed-part and offered-part records before buying hydraulic components. Review version, interface and control differences with XINYA.
Learn More
Excavator hydraulic pump with regulator assembly
What We Do

Services we Offer

service1

What if there are quality problems with the purchased products?

Please rest assured completely. We implement strict quality control throughout the whole production process. From raw material incoming inspection to finished product delivery, all items undergo multiple rounds of rigorous technical inspection and performance testing, to fully ensure every delivered product meets 100% qualified standards. All unqualified products detected during inspection will be disposed of by centralized destruction, to firmly prevent defective goods from entering the market. Meanwhile, we provide an extended warranty period of 6 to 12 months for all products. Within the warranty period, if any non-artificial quality failure occurs, please contact us promptly. Our professional technical team will respond at the earliest time and offer targeted solutions based on actual conditions. In addition, we deliver all-round technical support to safeguard your after-sales operation. Always taking customer satisfaction as the core principle, we are committed to establishing long-term and stable cooperative partnerships with global clients.
service2

What happens if the delivered item is unsuitable for my needs?

Please rest assured. To ensure that the products you receive fully meet your needs, we will conduct multiple rounds of demand confirmation with you before shipment, fundamentally avoiding the problem of wrong or missing delivery. To further ensure accuracy, we will first conduct precise query and verification through the product part number you provide to ensure that the product model and specifications are completely matched. If you do not have an accurate part number temporarily, we will arrange professional technicians to check and confirm one by one according to the clear product pictures and corresponding construction machinery models you provide, and communicate and synchronize with you throughout the process until confirmed correct before arranging shipment, to fully ensure that you receive the products you need and avoid unnecessary troubles.
service3

What professional shipping and delivery standards can we provide you?

Within our international trade operations, we prioritize a high-efficiency supply chain and a transparent logistics framework. To ensure the accuracy of every shipment, a standardized PDI (Pre-Delivery Inspection) system is strictly enforced. Before the final sealing of containers, our QC specialists conduct a thorough re-examination. We provide clients with high-resolution photos of the actual items, packaging details, and the Packing List for Visual Confirmation, ensuring 100% compliance with order specifications and delivery transparency. We support versatile Incoterms, including EXW and FOB. To meet diverse delivery timelines and cost constraints, we offer a multi-modal logistics matrix ranging from Ocean Freight and Air Freight to global couriers (DHL/FEDEX/TNT/EMS). We guarantee full professional documentation support for every shipment to ensure a safe, timely, and compliant arrival at the port of destination.
Send Your Message

Get in Touch

We are a global one-stop supplier of excavator spare parts. We maintain full control over the entire process from R&D and manufacturing to sales, delivering top-quality excavator components to you.

    Your Name *

    Email *

    Phone/WhatsApp *

    Company website

    Message*

    Products
    Contacts
    WhatsApp
    Email